Architects’ Journal - Supershed
04-Feb-10
Junction Arts and Civic Centre is a £2.45M project completed with Buschow Henley. Approximately 75% of the existing steel frame structure, slab and foundations was re-used, ensuring the embodied energy of these elements was not wasted.
Read more (0 comments)
Category: Articles
Tags: Junction Arts and Civic Centre, Sustainable, Structure Re-use, Change of Use
Architecture Today - Uptown Shop for Rankin
30-Jan-10
Trevor Horne Architects' adaptive reuse of a north London warehouse is now a photographers's home and studio.
Read more (0 comments)
Category: Articles
Tags: Change of Use, Roof Extension, Artist Studio, Trevor Horne Architects
Detail Green – Saving 120 tonnes of CO2
02-Sep-09
Stadthaus, Murray Grove in London with Waugh Thistleton Architects. The article explores how sustainable constructions made of timber are.
Read more (0 comments)
Category: Articles
Tags: Stadthaus, Cross-Laminated Timber, Waugh Thistleton Architects, Residential


